Convert Old 24v Power Supply to New 24v 500 Watt Cosel, V3

Convert Old 24v Power Supply to New 24v 500 Watt Cosel, V3

Convert Old 24v Power Supply to New 24v 500 Watt Cosel


Cut off the red and black wire connector, remove the board. 


Butt splice the three red wires to one tail with a ring terminal


Connect the new tail to the new power supply and mount to the board using one of the screw holes. 


    • Related Articles

    • 24 Volt Power Supply Test

      24 Volt Power Supply Test Slayer recommends that all service on electrical parts be performed by an experienced Slayer Espresso trained technician. Time: <5 minutes Tools: #2 Philips head screwdriver Voltmeter Servicing, operating, and installing ...
    • Testing No Power, Single Group

      Testing No Power, Single Group Time Needed: 10 Minutes Parts Needed: None Tools Needed: #2 Phillips Screwdriver Multi Meter Circuit Board Reference #1 - Main power - 24v DC from power supply #2 - Relay #3 - Display ribbon cable #4 - Transducer #5 - ...
    • Single Group Board Power Test

      Unplug the machine.  Remove the back panel, being aware of the ribbon cable attached to the screen.  Unplug all the plugs except #1 and #3.  Follow #3 up to the screen and make sure it is attached to the screen, set the back panel to the left side of ...
    • Replacement of SSR on Power Supply V3

      Replacement of SSR on Power Supply V3 Tools Needed: #2 Philips Head Screwdriver, Large flat head screwdriver, Needle nose pliers, 2 x 7/16" wrenches.  Time Needed 30-45 minutes.  1. Verify the incorrect relay's are on the power supply.  2. Remove the ...
    • Power Harness Wiring - Slayer V3

      Power Harness Wiring - Slayer Espresso V3 Slayer recommends all service be performed by an experienced Slayer Espresso trained technician. Harness wiring positions for the main Molex connection between the power terminal and electronics panel. Wire ...