Draining Tanks - Steam Line - Video
Related Articles
Pre-Infusion Solenoid Troubleshooting - Steam LP
Pre-Infusion Solenoid Troubleshooting - Steam LP Slayer recommends that all service be performed by an experienced Slayer Espresso trained technician. Slayer Steam LP's Pre-Infusion solenoid is a 24v DC 3-way solenoid which enables a group to ...
Draining Tanks, Steam
Draining Tanks, Steam Series Time Needed: 10-15 minutes Parts Needed: None, There is an internal drain manifold which will exit the drain hose. Tools Needed: None Step 1: Turn off dedicated water source to the machine. Turn off breaker switch and ...
Slayer Board Wiring - Steam Series
Control board wiring diagrams for Slayer Steam Series. These schematics can be used for identifying control inputs and for reference when replacing the board. *Steam X board wiring can be referenced by the Steam EP drawing.* Questions identifying a ...
Single Group & V3 Steam Wand Rebuild (VIdeo)
Click the link below to watch a video on performing preventative maintenance on the steam wand Steam Wand Rebuild
Steam Valve & Wand Rebuild - Espresso Series (Video)
Espresso Series DVG Valve & Wand Rebuild Click the link below to watch a video on performing preventative maintenance on the steam valve and wand assembly? Steam Valve Rebuild Parts Needed: 46900-10010 Steam Valve Rebuild Kit (spring, crush washer, ...