Draining Tanks - Steam Line - Video

Draining Tanks - Steam Line - Video

    • Related Articles

    • Pre-Infusion Solenoid Troubleshooting - Steam LP

      Pre-Infusion Solenoid Troubleshooting - Steam LP Slayer recommends that all service be performed by an experienced Slayer Espresso trained technician. Slayer Steam LP's Pre-Infusion solenoid is a 24v DC 3-way solenoid which enables a group to ...
    • Draining Tanks, Steam

      Draining Tanks, Steam Series Time Needed: 10-15 minutes Parts Needed: None, There is an internal drain manifold which will exit the drain hose.  Tools Needed: None Step 1: Turn off dedicated water source to the machine. Turn off breaker switch and ...
    • Slayer Board Wiring - Steam Series

      Control board wiring diagrams for Slayer Steam Series. These schematics can be used for identifying control inputs and for reference when replacing the board. *Steam X board wiring can be referenced by the Steam EP drawing.* Questions identifying a ...
    • Single Group & V3 Steam Wand Rebuild (VIdeo)

      Click the link below to watch a video on performing preventative maintenance on the steam wand Steam Wand Rebuild
    • Steam Valve & Wand Rebuild - Espresso Series (Video)

      Espresso Series DVG Valve & Wand Rebuild Click the link below to watch a video on performing preventative maintenance on the steam valve and wand assembly? Steam Valve Rebuild Parts Needed: 46900-10010 Steam Valve Rebuild Kit (spring, crush washer, ...