Replacing Group Head Gasket - Universal

Replacing Group Head Gasket - Universal


Replacing Group Head Gasket



Objective:
Replace group head gasket per Slayer's recommended Preventative Maintenance schedule. All SLAYER Espresso machines and Preventative Maintenance Kits feature 58mm x 6.1mm EPDM group head gaskets.

Parts:
  1. 46000-56091 PORTAFILTER GASKET
Tools:
  1. 45 or 90 Pick
  2. Flathead Stubby Screw Driver
  3. Portafilter 
Step 1:
  1. Remove dispersion screw and screen.


Step 2:
  1. Using a pick, remove old group head gasket.
Gasket may be stiff and brittle if maintenance is overdue!



Step 3:
  1. Clean group head with scrubber brush.
  2. Install new gasket with the flat edge orientated in the UP position.
    1. In the image below, the visible part of the gasket presses up and into the group head.


Portafilter basket is designed to contact tapered edge of gasket.



Step 4:
  1. Once installed. Press gasket into place and engage one ear of a portafilter into the group and rotate counter clockwise to seat the gasket.
  2. Repeat on other ear.


Step 5:
  1. Verify gasket is seated correctly by inserting a blank portafilter and activating the group.
Reinstall dispersion screen and screw either finger-tight or less than a quarter turn with a flat head screwdriver! This will ensure the convex shape of the SLAYER dispersion screen is not unintentionally flattened.



Questions or concerns? Please contact: support@slayerespresso.com
    • Related Articles

    • Portafilter Head Replacement

      Portafilter Handle Removal Procedure Install portafilter into the group head Grip the handle tightly and rotate in a counter clockwise direction Remove old portafilter head from group ​Install new portafilter head Install the new portafilter handle ...
    • Preventative Maintenance and Cleaning Procedures, Single Group

      Single Group Cleaning and Preventative Maintenance Cleaning and Preventative Maintenance (PM): What is preventative maintenance and how does it differ from changing major parts? Similar to changing the oil in your car, PM is routine maintenance to ...
    • Group Magnet Switch Adjustment - Universal

      Group Mag Switch Alignment Objective: Inside the group head is a tongue with a magnet installed on it. This magnet comes in contact with the group switches which send signals to the control board for brewing. Occasionally, those magnets can become ...
    • Panel Installation - Single Group

      Single Group Panel Installation Slayer recommends that all service be performed by an experienced Slayer Espresso trained technician. Objective: Install and remove panels for maintenance, service, and panel replacement. Please contact Slayer Tech ...
    • Neck Cover Alignment - Universal

      Slayer Espresso, Single Group, & Steam Series Neck Cover Alignment All Slayer models feature a fabricated stainless neck cover designed to rest between the upper front panel and group head cover. Free floating and adjustable, the neck cover protects ...