Replacing Expansion Valve - Single Group

Replacing Expansion Valve - Single Group


Replacing Expansion Valve on Single Group (Pre-2023)



Objective:
Expansion valves should be replaced as part of your preventative maintenance cycle. The style on the Single Group is pre-set to 11bar, but can occasionally require adjustment or replacement.

Time:
20 minutes

Tools:
Small flathead screwdriver
Adjustable wrench
Microfiber towel

Parts:
42000-50040 Expansion Valve

Procedure 

Please view the video in the link below.
Password: prebrew




    Questions or concerns? Please contact: support@slayerespresso.com
    To order parts, click here.




      • Related Articles

      • Setting Expansion Valve On V3

        Calibrating Expansion Valve on Espresso V3 Objective: Expansion valves should be replaced as part of your preventative maintenance cycle. The style on the V3 and Steam X require calibration after installation. Time: 15 minutes Tools: 1/2" fitted ...
      • Single Group Internal Diagram

        1. 3-Way Brew Solenoid 8. Vacuum Breaker 2. Needle Valve 9. Pressure Relief Valve 3. Inlet (Autofill) Solenoid 10. Brew Gauge 4. Steam Valve 11. Expansion Valve 5. Hot Water Valve 12. Steam Tank Ball Valve, Drain 6. Transducer 13. Brew Tank Ball ...
      • Replacing Circuit Board Single Group

        Replacing Circuit Board Single Group   Tools Needed: #2 phillips head screw driver, #0 phillips head screw driver. Time Needed: 10 minutes Unplug machine and turn off water Remove Cup Tray Remove the two screws on the back panel under where the cup ...
      • Preventative Maintenance and Cleaning Procedures, Single Group

        Single Group Cleaning and Preventative Maintenance Cleaning and Preventative Maintenance (PM): What is preventative maintenance and how does it differ from changing major parts? Similar to changing the oil in your car, PM is routine maintenance to ...
      • Panel Installation - Single Group

        Single Group Panel Installation Slayer recommends that all service be performed by an experienced Slayer Espresso trained technician. Objective: Install and remove panels for maintenance, service, and panel replacement. Please contact Slayer Tech ...