SlayerTECH Pre-Work Training Materials

SlayerTECH Pre-Work Training Materials


Pre-Work Materials for Virtual SlayerTECH Training



Please review all subsequent material ahead of the training session you will attend. This will help better prepare for the material in our online training.






Need to sign up? Click here to RSVP or email training@slayerespresso.com

    • Related Articles

    • Pre-Brew Calibration - Espresso Series

      Pre-Brew Flow Rate Calibration - SLAYER V3 & Single Group Do not tighten Needle Valve below the 40g/30s threshold. Important: Over-tightening the valve may damage or break the needle inside. Only adjust the flow rate incrementally. SLAYER Espresso ...
    • Replace Pre-Infusion Solenoid Slayer Steam LP

      Replace Pre-Infusion Solenoid Slayer Steam LP Time Needed: :30min - 1:00hr Tools Needed: Adjustable wrench, #2 screw driver.  Turn off the machine, unplug from power source.  Turn off water.  Raise hood of the machine Open Drain Line for group being ...
    • Calibrate Expansion Valve - Steam LP

      Calibrate Expansion Valve - Steam LP SLAYER recommends all service be performed by an experienced SLAYER Espresso trained technician. For a technician reference near you, please contact SLAYER Support at (206)-284-7171 (#1 in Directory) or email ...
    • Pre-Infusion Solenoid Troubleshooting - Steam LP

      Pre-Infusion Solenoid Troubleshooting - Steam LP SLAYER recommends all service be performed by an experienced SLAYER Espresso trained technician. For a technician reference near you, please contact SLAYER Support at (206)-284-7171 (#1 in Directory) ...
    • Program and Calibrate Volumetrics - Slayer Steam X

      Program and Calibrate Slayer Steam X Volumetrics Time: 10 minutes Tools: Espresso Scale Preparation: Calibrating volumetrics requires considerate espresso preparation. External factors such as coffee, dose, and tamp equally contribute to the quality ...