Verifying Correct Transducer Setting EP
Verifying Correct Transducer Setting
Time: 5 min
Tools: none
Scroll to "Switch Off", press the toggle, scroll to yes and switch off.
From the Switched Off menu press and hold the toggle for 12 seconds
Once in the production menu, scroll to Xducer type (transducer type)
Confirm the transducer type.
Confirm the transducer type
Scroll to exit menu. Press the toggle.
Press the toggle to initialize the machine.
Related Articles
Replacing Transducer Assembly, Single Group Classic
Slayer Single Group (Classic) transducer replacement UPDATE: Honeywell transducers have been phased out. Please click here for updated instructions. If you still have new legacy Honeywell transducers on hand, see below for replacement instructions. ...
Eltek Transducer Retrofit - Single Group Classic
Slayer Single Group (Classic) transducer retrofit guide Slayer recommends that all service be performed by an experienced Slayer Espresso trained technician. Objective: Update legacy Single Group machines to current Eltek transducer assembly. ...
Eltek Transducer Retrofit - Steam Series
Slayer Steam & Steam X Technician's retrofit guide for Slayer Steam Series. Slayer recommends that all service be performed by an experienced Slayer Espresso trained technician. Objective: Update legacy Steam Series machines to current Eltek ...
Program & Calibrate Volumetrics - Steam EP
Program, Calibrate, & Troubleshoot Steam EP Volumetrics Pre-Wet, Hold, & Pulse Count Designed with the needs of the modern specialty cafe in mind, Steam EP was made for coffee people, by coffee people. Objective: Each button is intuitively ...
Setting Pump and Regulator Assembly - Slayer Steam X
Setting Pump & Regulator - Steam X Objective: Steam X was designed with a unique pump assembly that featured an in-line pressure regulator for the brew circuit. This guide will demonstrate how to calibrate this assembly. Time: 15 minutes Tools: ...