Preventative Maintenance & Cleaning Procedures - Espresso Single Group

Preventative Maintenance - Espresso Single Group
Objective:
Preventative Maintenance (PM) is... preventative(!) and commonplace for all espresso machines regardless of make and model. Similar to changing the oil in your car. PM is comprised of replacing a dozen or so wearable components at key contact points and safety mechanisms to ensure your SLAYER Espresso Machine exceeds expectations day in and day out. PM components (listed
HERE) are wearable by nature and should be regarded as the first line of defense against requiring emergency technical support!
PM components are intended to be replaced annually on three, six, and twelve month intervals* and recommended (on the twelfth month) to be serviced by an experienced SLAYER trained technician. For a list of SLAYER technician references in your area: please contact
support@slayerespresso.com or call 206 284 7171 (#1 in the Directory).
Additionally, maintaining your SLAYER results in great tasting espresso and unrivaled steam quality. Who could ask for more?!
*See Post Service Checklist & Resources Section for further details.
Parts:
- SLAYER Preventative Maintenance Kits
- 46000-60010 - 125g SLAYER Cleaner
Quarterly PM: Every 3 Months
Replace group gasket and inspect dispersion screen & screw.
- Replacing Group Head Gasket

3 Month PM Parts:
- 46000-56091 PORTAFILTER GASKET
- 46000-50073 NANO COATED SHOWER SCREEN
- 46000-50080 DIFFUSER SCREW, STAINLESS
Bi-Annual PM: Every Six Months
- Drain steam and brew tank.
- Replace group gasket and inspect dispersion screen & screw as instructed in Quarterly PM.
- Rebuild steam & hot water wand assemblies.
- Rebuild steam & hot water valve:
- Steam Valve & Wand Rebuild - Espresso Series
- Don't forget to lube valve pin & o-rings!
- Inspect steam tip and hot water spout for obstructions and scale build up.

Steam & Hot Water valve use the same PM parts!
6 Month PM Parts:
- 46000-50030 O RING FOR STEAM TIP, 1.5 X 6
- 46005-53110 STEAM SEAL
- 46005-53061 Wand Bushing
- 46000-53050 O-Ring for Valve Bushing
- 46000-53070 TEFLON GASKET 27MM
- 46000-56091 PORTAFILTER GASKET
- 46000-50073 NANO COATED SHOWER SCREEN
- 46000-50080 DIFFUSER SCREW, STAINLESS
- 46900-10010 Steam Valve Rebuild Kit (spring, crush washer, plunger w/ gasket)
- 46000-53090 O-Ring for Brass Steam Valve Pin
Using only water as a lubricant, do not apply SLAYER Lube to Steam Seal, Wand Bushing, or wand ball joint interface. Introducing lube to the ball joint can cause wand flop. Annual PM: Every Twelve Months:
- Drain steam and brew tank.
- Replace group gasket and inspect dispersion screen & screw as instructed in Quarterly PM.
- Verify water against SLAYER's Water Treatment Requirements.

Pro Tip: During service and mechanical disassembly, clean and visually inspect machine for areas of concern or debris accumulation. Espresso machines tend to collect all matters of dust and coffee debris that can be troublesome down the road. A well maintained SLAYER is easier to service!
Rebuild:
- Rebuild Steam & Hot Water wand assemblies as instructed in Bi-Annual PM.
- Brew Group Actuator Rebuild - Universal
- Step 4 details PM components.
Replace:
- Vacuum Breaker, Pressure Relief Valve, and Level Probe.
- Apply several wraps of teflon tape to threads prior to installation.
- Do not forget copper crush washers!

Safely depressurize steam tank prior to removing preventative maintenance components!

Replace:
- Expansion Valve
- Apply several wraps of teflon tape to threads prior to installation.
- Discharge Tubing

*Group cap removed for illustration purposes.
12 Month PM Parts:
- 46000-50030 O RING FOR STEAM TIP, 1.5 X 6
- 46005-53110 STEAM SEAL
- 46005-53061 Wand Bushing
- 46000-53050 O-Ring for Valve Bushing
- 46000-53070 TEFLON GASKET 27MM
- 46000-56091 PORTAFILTER GASKET
- 46000-50073 NANO COATED SHOWER SCREEN
- 46000-50080 DIFFUSER SCREW, STAINLESS
- 10000-16210 SPACER
- 42000-10170 EXPANSION VALVE,11 BAR, 1/8NPT IN X G1/8 OUT
- 40000 -32160 SILICONE RUBBER HOSE ID 6mm X OD 10mm
- 30000-50170 WATER LEVEL PROBE, STEAM / SINGLE GRP,103mm
- 46000-50150 GASKET , COPPER, FLAT, 19X13.5X1.5mm
- 46000-50400 CB PRV, 1.9 BAR
- 46000-50130 GASKET, COPPER ,FLAT, 22X17X1.5mm
- 46000-50140 VALVE, ANTI-SUCTION/VACUUM, 1/4"
- 46900-10010 Steam Valve Rebuild Kit (spring, crush washer, plunger w/ gasket)
- 46000-53090 O-Ring for Brass Steam Valve Pin
Post Service Checklist & Resources:

SLAYER Preventative Maintenance Note: All
SLAYER PM Guides and Kits are built around quarterly service. In general, this is suitable for home and commercial users alike. However, there are various factors which may increase service frequencies such as: cafe volume, water quality, environment, misuse, and disregard for regular service. SLAYER recommends evaluating these variables with a local service technician to curate an appropriate maintenance schedule to fit your needs.
After preventative maintenance service has been completed. SLAYER recommends the following tests once the machine has returned to set temperature and pressure.
Checklist:
- Confirm no leaks are present and machine has safely reached set temperature and pressure.
- Verify brew pump pressure.
- Set rotary vane pump to 10 bars with a blank portafilter.
- Observable on brew gauge.
- Actuate contact points.
- Brew Actuator:
- Pre-Brew, Full-Brew, and Post
- Steam & Hot Water Actuator:
- ON & OFF
- Smooth Actuation
- Calibrate Needle Valve - Espresso Series
- Dial in and evaluate a few extractions.
- Verify water against SLAYER's Water Treatment Requirements.
- Log anomalies.
Resources:
SLAYER recommends all service be performed by an experienced SLAYER Espresso trained technician. For a technician reference near you, please contact SLAYER Support at (206)-284-7171 (#1 in Directory) or email support@slayerespresso.com.
Questions or concerns? Please contact support@slayerespresso.com
Related Articles
Preventative Maintenance & Cleaning Procedures - Steam LP
Preventative Maintenance & Cleaning Procedures - Steam LP Objective: Preventative Maintenance (PM) is... preventative(!) and commonplace for all espresso machines regardless of make and model. Similar to changing the oil in your car. PM is comprised ...
Preventative Maintenance & Cleaning Procedures - Steam Single
Preventative Maintenance (PM) Schedule - Steam Single Objective: Preventative Maintenance (PM) is... preventative(!) and commonplace for all espresso machines regardless of make and model. Similar to changing the oil in your car. PM is comprised of ...
Preventative Maintenance and Cleaning Procedures, Steam X
Preventative Maintenance (PM) Schedule Steam X Cleaning and Preventative Maintenance (PM): What is preventative maintenance and how does it differ from changing major parts? Similar to changing the oil in your car, PM is routine maintenance to ensure ...
Preventative Maintenance Kits - 2025
Preventative Maintenance Kits - Parts List & Pricing 2025 Prices in USD and subject to change. Please contact orders@slayerespresso.com with any questions or concerns. SLAYER offers preventative maintenance kits for all available models. Each kit is ...
Replacing Expansion Valve - Espresso Single Group
Replacing Expansion Valve - Espresso Single Group (Pre-2022) Objective: Expansion valves should be replaced as part of your preventative maintenance cycle. The style on the Single Group is pre-set to 11bar, but can occasionally require adjustment or ...