V3
Uncrating Slayer V3
Just got your machine? Excited to bust it out of the crate and start brewing some espresso? The guide below will walk you through uncrating your Slayer Espresso V3. Slayer Espresso V3
Steam Valve & Wand Rebuild - Espresso Series (Video)
Espresso Series DVG Valve & Wand Rebuild Click the link below to watch a video on performing preventative maintenance on the steam valve and wand assembly? Steam Valve Rebuild Parts Needed: 46900-10010 Steam Valve Rebuild Kit (spring, crush washer, ...
Single Group & V3 Steam Wand Rebuild (VIdeo)
Click the link below to watch a video on performing preventative maintenance on the steam wand Steam Wand Rebuild
Replacement of SSR on Power Supply V3
Replacement of SSR on Power Supply V3 Tools Needed: #2 Philips Head Screwdriver, Large flat head screwdriver, Needle nose pliers, 2 x 7/16" wrenches. Time Needed 30-45 minutes. 1. Verify the incorrect relay's are on the power supply. 2. Remove the ...
Removing Panels V3
Removing Panels V3 Time Needed: 1-2 Hours Tools Needed: #3 flat head screwdriver, #2 Phillips screwdriver, #2 Stubby screw driver, Crescent wrench Turn off the machine, Unplug from wall Turn off water to the machine Open steam valve to drain all ...
Convert Old 24v Power Supply to New 24v 500 Watt Cosel, V3
Convert Old 24v Power Supply to New 24v 500 Watt Cosel Cut off the red and black wire connector, remove the board. Butt splice the three red wires to one tail with a ring terminal Connect the new tail to the new power supply and mount to the board ...
Checking Operations of Pre-Heat Boiler, V3
Checking Operations of Pre-Heat Boiler V3 Tools needed: Multi Meter, Screwdriver Time Needed: 30 minutes Check your love controller, press set once and it'll illuminate a red dot under out1. Is the setting correct? Please verify all settings for the ...
Cleaning Brew Gauge Tube, V3, Single Group
Cleaning Brew Gauge Tube Tools Needed: 3/8 wrench #2 Phillips screw driver Time: 10-15 minutes Turn off the machine and shut off water from the power source Remove the cup tray and set aside Remove the front panel by ...
Lubricating Actuator Pin, Single Group, V3
If the steam wand or hot water tap is leaking slighty, the actuator pin might be stuck. This issue can be solved with lubricating the o-rings on the actuator pin. Lubricating Actuator Pin Using a large Flathead screw driver remove the actuator screw ...
Catch Test, V3/Single Group
Catch Test What does a catch test tell us? A catch tests tells us a lot of information in a little amount of time. Mainly if there is any restriction of flow anywhere in the brew system. If we know the flow path is clear, we can troubleshoot ...
Replacing hot water mix
Remove back panel Remove side panel Drop electronics: https://app.frame.io/presentations/1c05af1b-9803-5d53-aea0-6bc4d9764216 Disconnect inlet tubes Disconnect inlet tube Disconnect gauge tube Disconnect inlet solenoid Disconnect clamp, remove drain ...
Draining V3
Draining Tanks, V3 Time Needed: 15-20 minutes Parts Needed: 2-5 pieces of 3' 1/8'' John Guest Tubing Tools Needed: 1/2' Wrench, 7/16' Wrench, Large Flathead Driver Step 1: Turn off low voltage and high voltage switches below the machine. Turn off ...
Error Code Identification - Love Controller
Love Control Errors Slayer recommends that all service be performed by an experienced Slayer Espresso trained technician. Objective: The Love Controller on the SLAYER V3 is the PID controller for both the pre-heat (SD1/Out1) and steam tanks ...
RTD Test, V3
This procedure tests the resistance of the RTD. The RTD measures the temperature of the brewing group. As the machine fluctuates in temperature, the resistance will change sending a signal to the board to heat or not heat the machine. Resistance on ...
Setting Pump, V3
Locate pump Locate adjustment screw on the right side of brass pump housing Loosen black lock nut with wrench Adjust to 10 bar with a blind portafilter in the grouphead by using a flathead screwdriver -Clockwise to raise pressure ...