V3 Cleaning and Preventative Maintenance
Cleaning and Preventative Maintenance (PM): What is preventative maintenance and how does it differ from changing major parts?
Similar to changing the oil in your car, PM is routine maintenance to ensure the that the machine is operating properly. These updates are replacing small parts (mainly gaskets) that will, over time and use, start to degrade. Major parts, covered under the 15 month warranty, are expected to work with minimal PM needed. PM’s are commonplace in all espresso machines and will increase the longevity of your machine.
Daily Cleaning*
Remove group screen and soak in warm water, wipe clean. **
Put 1/2 teaspoon (3 grams) espresso cleaner into blind portafilter***
Insert portafilter into grouphead and activate brew cycle for 20 seconds. Let the group sit idle for 20 seconds.
Activate the brew cycle for 5 seconds then deactivate of 5 seconds. Repeat this step 5 times.
Deactivate the brew cycle, remove the portafilter and activate the brew cycle To flush the group head for 30 seconds
With no cleaner in the blank portafilter, repeat step 3 and 4.
Replace group screen
* Cleaning the machine everyday will decrease the likelihood of issues and insures your coffee quality will remain high. Who could ask for more?
** Evaluate the screen for any dents, blemishes or flaking.
*** Using more than the recommended amount of cleaner can cause issues to the machine.
Preventative Maintenance (PM) Schedule
V3
Daily:
Remove & Clean Group Head Screens
Backflush Group Heads
Follow with a clean water backflush only using water.
Soak Portafilter Baskets
Quarterly PM = 1 hours or less.
Every 3 Month PM:
Bi-Annual PM = 1-2 hours
6 Month PM:
Annual PM = 2 hours
12 Month PM:
* The timing for preventative maintenance will vary depending on usage and water quality. To read more about water quality, consult your single group user guide, page 6-7.
** Draining steam and brew tank is recommended at least once a year. This decreases the chance of calcification on the machine