Preventative Maintenance and Cleaning Procedures, V3

Preventative Maintenance and Cleaning Procedures, V3

V3 Cleaning and Preventative Maintenance


Cleaning and Preventative Maintenance (PM): What is preventative maintenance and how does it differ from changing major parts?


Similar to changing the oil in your car, PM is routine maintenance to ensure the that the machine is operating properly. These updates are replacing small parts (mainly gaskets) that will, over time and use, start to degrade. Major parts, covered under the 15 month warranty, are expected to work with minimal PM needed. PM’s are commonplace in all espresso machines and will increase the longevity of your machine.


Daily Cleaning*


  1. Remove group screen and soak in warm water, wipe clean. **

  2. Put 1/2 teaspoon (3 grams) espresso cleaner into blind portafilter***

  3. Insert portafilter into grouphead and activate brew cycle for 20 seconds. Let the group sit idle for 20 seconds.

  4. Activate the brew cycle for 5 seconds then deactivate of 5 seconds. Repeat this step 5 times.

  5. Deactivate the brew cycle, remove the portafilter and activate the brew cycle To flush the group head for 30 seconds

  6. With no cleaner in the blank portafilter, repeat step 3 and 4.  

  7. Replace group screen


* Cleaning the machine everyday will decrease the likelihood of issues and insures your coffee quality will remain high. Who could ask for more?


** Evaluate the screen for any dents, blemishes or flaking.


*** Using more than the recommended amount of cleaner can cause issues to the machine.



Preventative Maintenance (PM) Schedule

V3


Daily:

  • Remove & Clean Group Head Screens

  • Backflush Group Heads

  • Follow with a clean water backflush only using water.

  • Soak Portafilter Baskets



Quarterly PM = 1 hours or less.

Every 3 Month PM:

Step 1: Change gasket for group head
Gasket for Group head
Step 2: Evaluate Nano coated shower screens
Nano coated shower screen



Bi-Annual PM = 1-2 hours

6 Month PM:

Step 1: Drain Machine

Step 2: Change gasket for group head
Gasket for Group head

Step 3: Evaluate Nano coated shower screens
Nano coated shower screen




Step 5: Evaluate or rebuild steam valves
Steam Valve Rebuild


Step 6: Evaluate or rebuild steam wand

Steam Wand Rebuild



Annual PM = 2 hours

12 Month PM:

Step 1: Drain machine

Step 2: Group actuator rebuild
Group Actuator Rebuild


Step 4: Replace level probe and anti-suction valve
Level Probe & Anti-Suction Valve


Step 5: Replace expansion valve (if V3)
Expansion Valve
Step 6: Rebuild Steam Valve and Steam Wand
Steam Wand Rebuild
Steam ValveRebuild


Step 7: Replace Pressure Relief Valve (24 month maintenance)
PRV

Step 8: Replace Nano Coated Shower Screen


Replace discharge tubing (24 month maintenance)
Discharge Tubing


* The timing for preventative maintenance will vary depending on usage and water quality. To read more about water quality, consult your single group user guide, page 6-7.


** Draining steam and brew tank is recommended at least once a year. This decreases the chance of calcification on the machine


    • Related Articles

    • Preventative Maintenance and Cleaning Procedures, LP

      Preventative Maintenance (PM) Schedule Steam LP Cleaning and Preventative Maintenance (PM): What is preventative maintenance and how does it differ from changing major parts? Similar to changing the oil in your car, PM is routine maintenance to ...
    • Preventative Maintenance and Cleaning Procedures, Steam X

      Preventative Maintenance (PM) Schedule Steam X Cleaning and Preventative Maintenance (PM): What is preventative maintenance and how does it differ from changing major parts? Similar to changing the oil in your car, PM is routine maintenance to ensure ...
    • Preventative Maintenance and Cleaning Procedures, Single Group

      Single Group Cleaning and Preventative Maintenance Cleaning and Preventative Maintenance (PM): What is preventative maintenance and how does it differ from changing major parts? Similar to changing the oil in your car, PM is routine maintenance to ...
    • Preventative Maintenance and Cleaning Procedures, Steam EP

      Preventative Maintenance (PM) Schedule Steam EP Cleaning and Preventative Maintenance (PM): What is preventative maintenance and how does it differ from changing major parts? Similar to changing the oil in your car, PM is routine maintenance to ...
    • Brew Group Actuator Rebuild - Universal

      Group Actuator Maintenance Time: 5-10 minutes Tools: #3 Philips screwdriver Flathead screwdriver #6 hex key Parts: 46000-53070 Gasket, Teflon 10000-16210 Spacer Food grade lube Procedure Step 1: Remove group cover by loosening the three Philips ...